Master & Main Cabin
Probably the first job tackled. Similar story to the cabins: horrible job stripping back all the old insulation and lining. Where the grab handles on the deck go through the deck, these leaked and so have been fully removed and filled. Same mistake in initially painting the surface, before sanding to key for adding in 10mm closed cell foam and carpet finish.
Master bed area is 2 singles (making it effectively king size). I added a padded head-board area, along with shelving. Various lighting upgrades.
The main area is largely the same as the original. Some new shelving added and the 12v fridge. Various new lighting added, including 2-way switches so they can be turned on/off from the cabin entrance, or the sleeping area.
This was my messy living area when I was doing a most of the work, and I apologise in advance for the dog hair. It is a pretty comfy spot though!