Forward Starboard Cabin

Original State

2024-09-19 13.04.362024-10-10 19.29.06

Stripping and Fibreglass Strengthening

2024-10-10 19.48.012024-12-08 14.09.542024-12-11 22.02.112024-12-12 11.06.532024-12-12 11.06.592024-12-12 11.07.31

Shelving, Insulation & The Moon

2024-12-12 21.36.152024-12-15 21.20.132024-12-16 21.30.322024-12-19 10.45.102025-02-01 11.22.59

Current Finish

2026-03-23 06.59.02

Similar story to the other cabins, this required a full strip (horrible job), and then refitting of insulation and finish. However it’s the one cabin that didn’t get a full finish, so it’s still got the original flooring, the cupboards are unpaited, and there’s no mattress.

Some fibreglass work to add some strength in some areas, but this was inside voids mostly. New shelves added and fibreglassed in to make strong.

Pretty close to final finish, a bit of paint if needed and a mattress cut to size and installed.